Castle museum Linz - New city access

Program
Revitalisation of an air protection tunnel, elevator underground extension
Status
Completion 2022
Height difference
24m
Tunnel length
70m
Location
Linz, Austria

The activation of an existing air protection tunnel and the underground extension of the existing passenger lift of the south wing down to the level of the Tummelplatz will create a new barrier-free city access directly into the foyer of the south wing. The use of the historic portal situation at Tummelplatz continues the central idea of the symbiotic connection of old and new.

 
Entrance portal
Entrance portal
Entrance area
S-curve
Strait
former air block
former air block
elevator access
Floorplan